Telegraph Lane
Extension • Hampshire
Project Description: Extension
Location: Hampshire
Total Gross Internal Area: Existing 204m²; Proposed 237m²
Planning Granted: July 2012
Construction Started: 2013
Construction Completed: 2013
Procurement Method: Main Contractor
Construction Technique:
Foundations & Substructure: Traditional mass concrete foundations with ground bearing slab.
Superstructure: Load bearing masonry cavity external walls with localised steel frame; timber cut flat roof structure.
Tony Holt Design Appointment: Stage 1 - Design & Planning. Stage 2 - Full working drawings including assembly details. Stage 3 - Tender Support. Stage 4 - Ad-hoc on site support.
TBC
Contact Us
Have a project in mind?
We’d love to hear about it. Whether you’re dreaming of an extension, planning a remodel, or considering a new home, get in touch and tell us a bit about what you’re hoping to achieve.
Every project starts with a conversation, and we’re excited to explore how we can help bring your ideas to life.